Modify and update scheduled publish tasks

It takes time to set up a publish task. It should not have to be deleted and recreated for every single change.

In the online interface allow the task to be:

  • Renamed

  • Paused (would not run until unpaused)

  • Reset (skip missed publish times and continue as normal - Ideally there would default to skip missed times and continue)

  • Run (Publish the items immediately, using the same settings, but without affecting the scheduled times)

  • Rescheduled (change the frequency and time of a publish).

In Revit, the scheduled tasks should be modifiable, so sheets and views can be added/removed (in addition to the above tasks that could be accomplished in the viewer