Better coordination, better buildings
Our contractor doesn't own NavisManage, is also in HydraCAD, and works in 2D so the AutoCAD views are less helpful. Trying to figure a way to make it easier to go to the 3D views and navigate them. In plain Navisworks, there is NO BIMTrack for him. So that leaves communication through BIM 360 Glue as the only option. Currently, we are creating the views based on BIM track issue 1 by 1 but having the ability to publish BIM Track issues to viewpoints in BIM 360 would save us a lot of time with this workflow.